Photo Gallery

commercial patch

There was cracked asphalt and some sinking. The sunken area was removed and re-based with crushed limestone, then topped with a 2 inch base layer of asphalt. The cracked area was milled away, primed with a liquid asphalt tack coat, & repaved with 2 inches of compacted asphalt

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *